Nous sommes le 06 Juin 2025, 18:27

Heures au format UTC + 1 heure




Poster un nouveau sujet Répondre au sujet  [ 226 messages ]  Aller à la page Précédente  1, 2, 3, 4, 5 ... 18  Suivante
Auteur Message
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 13:58 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The operator tried if he can also do the demoltion job :lol:


Image
Shot at 2011-09-03


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 14:16 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
A truck will bring special thick steelplates. They are more protecting the street. And they will not be damaged in stead of wooden plates. The crawlers will damage it.


Image
Shot at 2011-09-03


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 18:33 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The final steelplates are on his place. Now it is waiting for the arrival from the Akerman EC 620.

There's also a video from the demolition: http://www.youtube.com/watch?v=E1KF5ag3Qrw

Image
Shot at 2011-09-03


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 18:46 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The Daf XF 95.380 truck brings the shear for the Akerman EC 620 HRD. Also he brings the shear for the Cat 345C excavator which also will be on the job.

Mit der 4-achsige Daf XF 95.380 wird die Schere auf die Baustelle transportiert. Auch hat er dabei der Backe fur der Cat 345C welche auch noch auf der Baustelle kommt.

Image
Shot at 2011-09-03


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 19:41 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The Daf XF 95.380 truck brings the shear for the Akerman EC 620 HRD and also the jaw of the Demarec shear for the Cat 345C.

Image
Shot at 2011-09-03


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 21:48 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
Another pic from the truck which deliver the Demolition tools on the project.

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 21:56 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
They use thick steel plates in stead of wood. Because the tracks wil damage it a lot on wooden plates.


Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 04 Sep 2011, 22:05 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
Alle plates for protection the street are on his place. Now it is waiting for the Akerman EC 620 which should arrive in very short time. The Cat 314C will try to show if he can do the demolition. :lol:

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 05 Sep 2011, 16:44 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The demolition excavator arrives. It is loaded on Nooteboom 2-bed-4 trailer from Van Wieren. De truck is a 5-axle Volvo FH 16 660.

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 05 Sep 2011, 16:49 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
Always nice to see a HRD demolition machine as load.

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 05 Sep 2011, 17:55 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
The only way to reach the demolition project is to go backwards.

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 05 Sep 2011, 17:56 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
And a new problem. A traffic sign. So the Akerman is started and raised the boom. So it is possible to go backwards in the street.

Image
Shot at 2011-09-04


Haut
 Profil  
 
 Sujet du message: Re: Demolition Wilgenflat Leeuwarden (NL), Jager
MessagePosté: 05 Sep 2011, 17:59 
Hors ligne

Inscription: 15 Juin 2008, 11:52
Messages: 466
So the combination is in the street. Now only go forward and cross the street. Then the demolition project is reached and can started with unloading.

Image
Shot at 2011-09-04


Haut
 Profil  
 
Afficher les messages postés depuis:  Trier par  
Poster un nouveau sujet Répondre au sujet  [ 226 messages ]  Aller à la page Précédente  1, 2, 3, 4, 5 ... 18  Suivante

Heures au format UTC + 1 heure


Qui est en ligne

Utilisateurs parcourant ce forum: Aucun utilisateur enregistré et 1 invité


Vous ne pouvez pas poster de nouveaux sujets
Vous ne pouvez pas répondre aux sujets
Vous ne pouvez pas éditer vos messages
Vous ne pouvez pas supprimer vos messages

Rechercher:
Aller à:  
cron
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group
Traduction par: phpBB-fr.com